The migration has begun. I apologize in advance for the slower site speeds. Everything is running on my E5-2600 v4 CPU Server. I still have one VM left to migrate, and I’m down to 16gb of memory left. I really have two, because the Nutanix Move is a VM that they suggest you install outside of the cluster. But I just wanted to drop this note. More progress later…
Related Posts
Upgrades and vCenter HA
So I had planned on shutting down my ESXi host that lives outside of the cluster, the one that manages…
What the heck is all that for?
Besides running up my electricity bill, what else is this good for? What am I doing with all this? Do…
Nutanix… Failure
So, there will be no Nutanix in my homelab, not for awhile. It was an utter shitshow. Let’s begin. First,…
