The migration has begun. I apologize in advance for the slower site speeds. Everything is running on my E5-2600 v4 CPU Server. I still have one VM left to migrate, and I’m down to 16gb of memory left. I really have two, because the Nutanix Move is a VM that they suggest you install outside of the cluster. But I just wanted to drop this note. More progress later…
Related Posts
Unexpected Illness
Plans, why do I even attempt to make them? Whenever I plan anything, something happens. My plan to start learning…
Ghetto Homelab Bill of Materials (BOM) 08.22.2024
Name Manufacturer/Model Description esxi01 SuperMicro SuperServer CSE-836 Intel E5-2690 v4 @ 2.60GHz 14c/28t, 12x16TB SAS HD in 2x raidz2 vdevs,…
Failure
So I’ve failed my first attempt at migrating. I was just using a single machine to test Foundation with, and…