The migration has begun. I apologize in advance for the slower site speeds. Everything is running on my E5-2600 v4 CPU Server. I still have one VM left to migrate, and I’m down to 16gb of memory left. I really have two, because the Nutanix Move is a VM that they suggest you install outside of the cluster. But I just wanted to drop this note. More progress later…